$799,000 GREY SUITE-ARB

5830 Heron Pl, West Sechelt
3 bd · 3.0 ba · 2,408 sqft · 6,458 sqft lot · built 1996 · 27 DOM · MLS R3143428
Suite potential (per listing)
Redfin ↗
Listing: Redfin search · fetched 2026-08-03T07:15

Description

Welcome to this beautifully updated home, perfectly situated on a quiet cul-de-sac in a welcoming neighbourhood just minutes from Sechelt. Offering 3 bedrooms and 3 bathrooms, this residence blends style and comfort with tasteful craftsman and modern farmhouse touches throughout. The flexible floor plan is designed for easy living, providing the ideal space to gather, unwind, or entertain. The home also offers the option to incorporate a suite, providing added versatility for extended family or potential income. Enjoy the convenience of being close to it all, including the local elementary school, scenic walking trails, and the nearby golf course. Ample parking for your RV or boat adds ever
From listing remarks (RE/MAX Oceanview Realty)

Rating 48 /100

Equity
32.9/40 +90,142 vs limit (+8.1% of ARV)
Cash flow
0/30 -1,469/mo
Suite-arb
15.0/15 add-a-suite opportunity, unpriced
Motivation
0.0/15 28d on market, no cuts — anchored seller

Offer case

Price can't fix this. rent test — needs 4,450/mo vs 3,000 estimated. Price cannot fix this; only higher rent (a suite) or a lower ARV would.

EVIDENCE

  • Coast-wide, homes sell at 97.6% of list — a 2.4% discount is simply normal here.
  • Only 28 days on market — too fresh for a big discount.
  • ARV confidence is LOW (thin or unrenovated comps) — the target price below could be off by 10%+ in either direction.
Support score 0.0 — evidence weight that this seller would entertain the discount. Not a prediction; a checklist with numbers.

The four tests

Equity — PASS
(price + $40,000 reno + PTT+legal closing) <= 85% x ARV
all-in = $799,000 + $40,000 + $16,480 = $855,480 ARV = $1,112,496 → limit = 85% × ARV = $945,622 margin = $90,142
Rent — FAIL
est. rent >= 0.40% x ARV
est. rent = $3,000/mo (whole house (3bd) $3,000) floor = 0.4% × ARV $1,112,496 = $4,450/mo rents table: Sechelt · as of 2026-08-02
Cash flow — FAIL
rent - carrying >= -800/mo (PM-managed, typical rent, at ask)
payment $3,201 (loan $639,200 @ 4.4%/30y) + tax $510 (mls) + ins $158 + maint $150 + vac $180 + PM $270 carrying = $4,469/mo · rent $3,000 → cash flow = $-1,469/mo (floor $-800)
Suite-arb — PASS
zone permits suite AND sqft >= 1,900 AND no suite language AND $/sqft < community median
zone R-2 suite:yes · sqft 2,408 (min 1,900) suite language: no · $/sqft 332 vs median 489
Scored 2026-08-03T08:55 · thresholds from criteria.yaml

Cash-flow scenarios $/mo · hover a cell for carrying cost

Price $3,000 typical
self-managed
$3,000 typical
PM
$3,450 high
self-managed
$3,450 high
PM
$799,000 −$1,199 −$1,469 −$799 −$1,109
$759,050 −5.0% −$1,039 −$1,309 −$639 −$949
$731,085 −8.5% −$927 −$1,197 −$527 −$837
Rents: rents.yaml as of 2026-08-02 · financing from criteria.yaml

Comps & ARV

ARV $1,112,496 — median $/sqft of 18 size-matched comps x 112% reno uplift (only 1 renovated comps found) · confidence low ($/sqft used: 412)

SoldDistSqftPrice$/sqftDateReno
5883 Spray St 0.29 km2,243 ~$1,462,574 6522025-09-05
5760 Turnstone Dr 0.29 km1,704 ~$877,154 5152025-11-24
5754 Binnacle Ave 0.3 km2,347 ~$486,874 2072026-04-24
5628 Medusa Pl 0.85 km2,353 ~$1,072,294 4562026-03-24
5693 Porpoise Bay Rd 1.08 km2,448 ~$682,990 2792026-01-27
6355 Baillie Rd 1.48 km2,288 ~$1,219,625 5332026-01-22
5457 Burley Pl 1.53 km2,090 ~$902,522 4322026-02-02
6217 Mika Rd 1.64 km2,506 ~$1,267,434 5062025-11-14
~ = final list price used as sale proxy (BC title registration lags ~6-12 mo)
Solds from Redfin sold-search + public-records sale prices (belowTheFold)

Price & sale history

Seller basis: $307,500, 2015-02-27 — asking +159.8%

2026-08-03new 799000 first seen at $799,000
2026-07-06Listed $799,000 GVR
2015-02-27Sold (Public Records) $307,500 Public Records
2015-01-12Listed $320,000 GVR
2002-09-10Sold (Public Records) $144,000 Public Records
History: Redfin belowTheFold · fetched 2026-08-03T07:15 · events observed by Coastwatch

Zoning & land

R-2 — Low Density Residential suite OK

Areas B/D/E/F: single-unit dwelling zone, so a suite is permitted (watch the wastewater service area carve-out), plus an auxiliary dwelling unit over 2000 m2 and an additional single-unit or two-unit dwelling over 3500 m2. Area A: over 2000 m2 gets a duplex second unit OR one auxiliary dwelling unit, over 4000 m2 a second single-unit dwelling; max 2 units. Sechelt R-2: secondary suite plus SSMUH — up to 4 units where BOTH community water and sanitary sewer are present, otherwise 900 m2 for a detached accessory dwelling unit. [Bylaw 722.9 s.7.2.2, s.5.24; Bylaw 337 s.611.1-611.2; Bylaw 580 s.1.2.2-1.2.5]

  • Rocky Beach Front, Escarpments and Slope Hazards — Steep-slope DPA: a geotechnical engineer's report is required for foundation work. This is the one that most often kills a lower-level suite excavation.
  • Slope greater than 20% to 30% — Steep-slope DPA: a geotechnical engineer's report is required for foundation work. This is the one that most often kills a lower-level suite excavation.
  • Slope greater than 30% — Steep-slope DPA: a geotechnical engineer's report is required for foundation work. This is the one that most often kills a lower-level suite excavation.
PID019-090-765
Parcel5830 HERON PL (Sechelt)
WastewaterDistrict of Sechelt sewer service
WaterChapman system
Fire protectionSechelt FPA
District of Sechelt Zoning Bylaw 580 (gis.sechelt.ca) · fetched 2026-08-03T05:43 · meanings from zoning_rules.yaml (verify before relying)

Assessment

Assessed total$774,000
Land / improvements $470,000 / $304,000 (61% land — the higher, the more the value is in the dirt)
Assessed / ask 0.97
BCA folio570.00323.126
BC Assessment via SCRD parcel layer · fetched 2026-08-03T05:55

Open questions

  • Confirm suite legality with the planning department — zone says yes, verify parcel specifics (parking, servicing, floor-area cap).
  • Listing itself advertises suite potential — ask what's already roughed in (plumbing, separate entrance, ceiling height).
  • Rocky Beach Front, Escarpments and Slope Hazards: Steep-slope DPA: a geotechnical engineer's report is required for foundation work. This is the one that most often kills a lower-level suite excavation.
  • Slope greater than 20% to 30%: Steep-slope DPA: a geotechnical engineer's report is required for foundation work. This is the one that most often kills a lower-level suite excavation.
  • Slope greater than 30%: Steep-slope DPA: a geotechnical engineer's report is required for foundation work. This is the one that most often kills a lower-level suite excavation.

Notes